Start with an order you can trace
Connect the plan to what actually happened: item, quantity, materials, operations and receipts. Each stage creates a movement and a responsibility that can be reviewed when explaining the cost.
The workflow
- Create and approve the order: define the item, quantity, bill of materials, warehouses and period. Link a project or sales order when needed.
- Prepare materials: check requirements and availability, then reserve and issue approved materials.
- Record operations: capture stages, quantities and time, stops and restarts, extra issues and unused material returns.
- Review quality and waste: record acceptance, rejection and causes. Complete required quality approval before accepted receipt.
- Receive finished goods: record the completed quantity in stock and review remaining work in progress.
- Review costs: check materials, labour, overhead and variances before authorised cost closure.
Illustrative simulation — not a customer case
An order plans 100 units. The team records 96 accepted units and 4 rejected units. Reviewing it requires more than dividing a total by 100: the rejection cause, approved quantity treatment, materials used or returned, and any rework must be recorded. These are hypothetical operating quantities, not an approved financial report or a measured customer result.
Questions for production and accounting
- Is each issue and return linked to the correct order?
- Do finished-goods receipts agree with accepted quantities after quality review?
- What explains material or time differences from the plan?
- Are all cost elements complete before closure, and who approves them?
The financial connection
The cycle helps trace material value, work in progress, finished production and unit cost. Allocation and accounting treatment are reviewed during factory setup; one treatment is not assumed to fit every accounting policy.
Bring one workflow to the demonstration
Choose one product, its bill of materials, operating stages and a cost question. We first understand the cycle, then show relevant movements, reports and controls. Customer records are not needed for an initial fit discussion.
Continue with your factory’s needs
Discuss your workflow before choosing a system
We start with your industry, problem and available data, then define a relevant demonstration.
Book a demonstration