Production costing connected to factory operations
Track production-order and unit costs, materials, labour, overhead and waste, and compare planned with actual figures in Masna3y Pro.
What changed the cost of this production order?
Material prices are only part of the picture. Actual issues, operating time, waste and manufacturing overhead can change the outcome. Masna3y Pro connects these movements to the production order so management can review the source of a cost before making pricing decisions.
What goes into the review?
- Materials issued to production and unused materials returned against the order.
- Direct labour and manufacturing overhead, using the factory’s approved allocation basis.
- Electricity, maintenance and other manufacturing expenses within the agreed accounting setup.
- Waste, losses and rework, and their effect on order and unit cost.
From daily movements to a management decision
- Define the item, quantity, bill of materials and operating stages before approving the order.
- Record actual material issues, returns, quantities and time.
- Review accepted and rejected quantities, waste and finished-goods receipts.
- Review order and unit costs and planned or standard versus actual variances before cost closure.
Worked example: from order cost to unit cost
An educational simulation using fictional figures, not market prices or customer results. Assume a completed order with 10,000 identical accepted units. All listed costs relate to that output. There is no work in progress, joint production or abnormal loss requiring separate treatment.
- Direct materials consumed: EGP 120,000.
- Direct labour: EGP 30,000.
- Manufacturing overhead allocated on an appropriate basis: EGP 50,000.
- Total finished-production cost = 120,000 + 30,000 + 50,000 = EGP 200,000.
- Average unit cost = 200,000 ÷ 10,000 = EGP 20.
- If the estimate was EGP 18 per unit for the same specifications and quantity, the estimated total was EGP 180,000. Actual cost is EGP 20,000 higher: EGP 2 per unit.
What should you investigate behind the variance?
Review material prices and quantities consumed, labour, overhead allocation and missing transactions. The variance alone does not establish waste or a specific error; check the supporting records before assigning a cause.
Do not apply this division directly to different products or an unfinished order. Manufacturing cost informs pricing; it is not the selling price or net profit. The factory’s accounting owner should review its costing policy and applicable treatment.
What should you check in a demonstration?
- The source of each cost element and the movements behind the report.
- The distinction between work in progress and finished production.
- How additional material issues, unused returns and cost adjustments are handled.
- The roles responsible for entry, approval and cost closure.
Which factories is this for?
Factories with connected material, inventory, production and accounting needs, especially when several orders run at once. A fit assessment starts with your operating cycle and costing rules. Special requirements or integrations need review before their scope is confirmed.
Does buying a system make the figures accurate?
Accurate reports require appropriate item data, bills of materials, opening balances, allocation rules and timely transaction entry. Standard setup, training and activation are included within the agreed scope, with practical technical and accounting support for system use. No unverified savings or customer results are claimed here.
Continue with your factory’s needs
- Production order to cost
- Sales order to production
- Find your industry
- Setup, training and support
- Pricing and service scope
Discuss your workflow before choosing a system
We start with your industry, problem and available data, then define a relevant demonstration.
Book a demonstration